Project: "Aluminaire"   -  
            Listing for Category : tail feathers
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Glenn Gordon   -  
Project:   Timber Tiger - ST-L Clipped-wing   -   VIEW REPORTS
Total Hours:583.9
Start/Last Date:Jun 01, 2022 - No Finish Date
Engine:Rotax 912ULS with big bore cylinder upgrade
Propeller:Sensenich Ground Adjustable
Panel:VFR / Glass / ADS-B / Comm / Xpndr / 2 Axis Autopilot
 
Friendly URL: https://eaabuilderslog.org?s="Aluminaire"

Home or Last Project Picture

Jan 27, 2024     Aileron Bellcrank cover fabrication - (2 hours)       Category: Tail Feathers
Aileron Bellcrank cover fabrication


 
Feb 19, 2024     Elevator Trim Rod cutout - (1 hour)       Category: Tail Feathers
Elevator Trim Rod cutout


 
Dec 31, 1969     Rudder Fairing platenut install. - (2 hours)       Category: Tail Feathers
, Rudder Fairing platenut install.


 
Jan 21, 2024     Completed fabrication of elevator trim tabs.       Category: Tail Feathers
Completed fabrication of elevator trim tabs.


 
Jun 19, 2022     Horizontal Stabilizer Final Assembly - (3 hours)       Category: Tail Feathers
Horizontal Stabilizer Final Assembly


 
Jul 07, 2022     Elevator Construction - (2 hours)       Category: Tail Feathers
Elevator Construction


 
Jul 06, 2023     Elevator Trim Tab and control horn fabrication. - (4 hours)       Category: Tail Feathers
Elevator Trim Tab and control horn fabrication.


 
Jun 22, 2023     Elevator Trim Tab Fabrication. - (4 hours)       Category: Tail Feathers
Elevator Trim Tab Fabrication.


 
Jul 01, 2023     Elevator Trim Tab Completion, - (5 hours)       Category: Tail Feathers
Elevator Trim Tab Completion,


 
Jun 21, 2023     Elevator Trim Tab Hinge Layout modification and fabrication. - (2 hours)       Category: Tail Feathers
Elevator Trim Tab Hinge Layout modification and fabrication.


 
Jun 20, 2023     Trim Tab Elevator Channel Prep. - (2 hours)       Category: Tail Feathers
Trim Tab Elevator Channel Prep.


 
Jun 18, 2022     Horizontal Stabilizer Final Assembly - (5 hours)       Category: Tail Feathers
Horizontal Stabilizer Final Assembly


 
Apr 03, 2022     Vertical stabilizer and rudder layout. - (2 hours)       Category: Tail Feathers
Vertical stabilizer and rudder layout on tabletop.


 
 
Jul 07, 2022     Elevator Construction - (2 hours)       Category: Tail Feathers
Elevator Construction


 
Jul 09, 2022     Elevator Construction - (4 hours)       Category: Tail Feathers
Elevator Construction


 
 
Jun 06, 2022     Horizontal Stabilizer - Initial fitting continued - (2 hours)       Category: Tail Feathers
Horizontal Stabilizer - Initial fitting continued


 
Jun 08, 2022     Horizontal Stabilizer - Initial fitting continued.       Category: Tail Feathers


 
Jun 01, 2022     Horizontal Stabilizer - Initial fitting - (2 hours)       Category: Tail Feathers
Horizontal Stabilizer - Initial fitting


 
May 28, 2022     Vstab fitting and assembly - (2 hours)       Category: Tail Feathers


 
May 26, 2022     Vstab parts fitting - (2 hours)       Category: Tail Feathers


 
May 24, 2022     Vstab and rudder fit - (2 hours)       Category: Tail Feathers


 
May 23, 2022     Vstab LE fit - (2 hours) Category: Tail Feathers
Vstab LE fit
 
May 19, 2022     Vertical and Rudder layout - (2 hours)       Category: Tail Feathers
Vertical and Rudder layout, transfer plans to table.


 
May 19, 2022     Vstab Spar splice - (1 hour)       Category: Tail Feathers


 
Jun 01, 2022     Leon adjusting vstab and rudder ribs - (1 hour) Category: Tail Feathers
Leon adjusting vstab and rudder ribs
 